QUALITY CONTROL PROCEDURE
The following notes are intended for the guidance of supervisory and inspection staff.
It is expected that Section Supervisor will exercise strict control over their sections to ensure that Inspector have minimum cause for rejection of materials due to faulty workmanship.
Inspector will be familiar with the standard laid down by AMG with reference to British Standards method of compliance and will cooperate fully with management to ensure that no product leaving the work fall below the criteria dictated by these standards.
DELIVERY INSPECTION
All aluminum profiles when delivered to be wrapped and tested for minimum micron thickness, top and bottom limits of color with approved apparatus. Profile to be checked for shapes and damages.
All damaged areas are to be clearly marked.
Once all checks have been made and cleared for usage, all faces of profiles will be taped for inspection.
WORKSHOP INSPECTION
This contains a description of the main activities to be executed during the performance and development of the project.
To sum up, the distinct features of AMG are best measured by the following key areas:
(1) Overall Planning and Control
In order ensure that schedule will be met, cost controlled, and maximum efficiency obtained during all phases of the project, our activities with the cooperation of the Consultant would include the following:
(2) Engineering and Design
The Engineering and Design Department forms the essence of the spectacular growth of AMG in terms of technical, qualitative, and productive aspects. To further streamline the department activities, it has been subdivided into five distinct but interlinked groups.
(3) Production and Quality Assurance
In order to ensure that quality standards are constantly maintained, AMG shall make the highest degree to commit to the following:
(4) Procurement and Transportation
All materials and products concerning the project are delivered with sufficient time to site.
AMG will render its full assistance in the round of chain activities of loading, shipping, unloading, and inland transportation through their process of planning, organizing and directing in close conjunction with the main contractor.
Procurement activities concerning necessary hardware, weather-stripping, gaskets, and sealant, will be performed by AMG in such a manner that all items are delivered timely to its plant for proper fabrication of the products.
(5) Installation
Trained installers under the supervision of qualified site Engineers controlled by the Project Manager are working in planned sequence, having regard to individual project requirements, covering, securing, to structural opening, alignment and application of leveling, shims covered with sealant with backing rod.