Approach to Projects
This contains a description of the main activities to be executed during the performance and development of the project.
In order ensure that schedule will be met, cost controlled, and maximum efficiency obtained during all phases of the project, our activities with the cooperation of the Consultant would include the following:

The Engineering and Design Department forms the essence of the spectacular growth of AMG in terms of technical, qualitative, and productive aspects. To further streamline the department activities, it has been subdivided into five distinct but interlinked groups.

In order to ensure that quality standards are constantly maintained, AMG shall make the highest degree to commit to the following:

All materials and products concerning the project are delivered with sufficient time to site.
AMG will render its full assistance in the round of chain activities of loading, shipping, unloading, and inland transportation through their process of planning, organizing and directing in close conjunction with the main contractor.
Procurement activities concerning necessary hardware, weather-stripping, gaskets, and sealant, will be performed by AMG in such a manner that all items are delivered timely to its plant for proper fabrication of the products.

Trained installers under the supervision of qualified site Engineers controlled by the Project Manager are working in planned sequence, having regard to individual project requirements, covering, securing, to structural opening, alignment and application of leveling, shims covered with sealant with backing rod.